Littoral Combat Ship: Actions Needed to Improve Operating Cost Estimates and Mitigate Risks in Implementing New Concepts

Front Cover
DIANE Publishing, 2010 - Technology & Engineering - 50 pages
The Navy plans to spend about $28 billion to buy 55 Littoral Combat Ships (LCS) and at least 64 interchangeable mission packages to perform one of three missions ¿ mine countermeasures, antisubmarine warfare, and surface warfare ¿ in waters close to shore. The Navy has been developing two different LCS seaframes and plans to select one for production in 2010. Due to the small 78-person crew size ¿ 40 core crew, 23 for aviation detachment, and typically 15 for mission packages ¿ the Navy is developing new concepts for personnel, training, and maintenance. This report assessed the extent to which DoD has: (1) estimated LCS long-term operating and support costs; and (2) developed plans to operate and support LCS. Illustrations.
 

Common terms and phrases

Bibliographic information