Littoral Combat Ship: Actions Needed to Improve Operating Cost Estimates and Mitigate Risks in Implementing New ConceptsThe Navy plans to spend about $28 billion to buy 55 Littoral Combat Ships (LCS) and at least 64 interchangeable mission packages to perform one of three missions ¿ mine countermeasures, antisubmarine warfare, and surface warfare ¿ in waters close to shore. The Navy has been developing two different LCS seaframes and plans to select one for production in 2010. Due to the small 78-person crew size ¿ 40 core crew, 23 for aviation detachment, and typically 15 for mission packages ¿ the Navy is developing new concepts for personnel, training, and maintenance. This report assessed the extent to which DoD has: (1) estimated LCS long-term operating and support costs; and (2) developed plans to operate and support LCS. Illustrations. |
Common terms and phrases
according to Navy alternatives amphibious transport docking Analysis Improvement Group block buy Combat Ship LCS Concept of Operations concepts for personnel core crew Cost Analysis Improvement cost estimating best Cost Estimating Guide decision makers Defense Acquisition Department of Defense developed distance support estimating best practices faces risks force structure analyses fully reflects best GAO best practices Government Accountability Office homeported implemented as envisioned LCS concept LCS crew LCS force structure LCS operational LCS positions LCS program LCS sailors LCS seaframes LCS training Littoral Combat Ship long-term operating Naval Sea Systems Navy officials Navy Personnel Command Navy plans Navy's non-selected operating and support operational concepts percent perform preventive maintenance procurement decision reflects best practices risk assessment risks in implementing rotational crewing Sea Systems Command seaframe to buy seaframes and mission Secretary of Defense Selected Acquisition Report Support Cost Estimating support LCS surface ships training days required training requirements


