NEW PIERS BUILT ON NORTH RIVER.

.......

Pier near Troy street, 110 feet long by 24-42 feet wide,
on piles, for dumping-board....
Pier at Bethune street, 120 feet long by 40 feet wide, on
piles......

$1,990 54

........

6,289 37

Pier at Horatio street, 130 feet long by 40 feet wide, on piles...

5,944 38

Pier at Twenty-sixth street, 300 feet long by 40 feet wide, on piles.......

13,583 09

Pier at Forty-sixth street, 500 feet long by 60 feet wide, on piles

28,631 40

Pier at Fifty-seventh street, 750 feet long by 30 feet wide, with side piers, each 400 feet long by 30 feet wide, or for a distance of 400 feet, 90 feet wide, built entirely on piles....

34,727 23

Pier at Ninety-sixth street, 250 feet long by 60 feet wide,

built entirely on piles......

14,704 11

PIERS REBUILT AND REPAIRED ON NORTH RIVER.

Pier at Laight street, 105 feet long by 60 wide, entirely rebuilt, with two new dumping-boards on it........ Pier near Twelfth street, damaged by ice, repaired and strengthened.

6,222 65

555 67

[ocr errors][merged small]

Piers at Horatio street, damaged by ice, repaired and

Pier at Thirtieth street, new piles, fenders, and timber..
Pier at Thirty-eighth street, new spring piles and fenders,
Pier at Forty-seventh street, some new sheathing and
plank, and removing sunken block at outer end.....
Pier at Seventy-ninth street, filled in and graded.........
Pier at Ninety-sixth street, damaged by ice, some new

and additional piles, and strengthened.

.......

243 28

2,090 54 553 26

1,748 76 678 94

811 04

67

BULKHEADS REBUILT AND REPAIRED ON NORTH RIVER.

Bulkhead between Piers Nos. 21 and 22, with two new

dumping-boards on it....

Bulkhead south of Pier No. 35, 100 feet long, 35-15 feet wide, on piles, for account of Erie Railroad Company, Bulkheads between Piers Nos. 37 and 38, and 38 and 39, some new backing-pieces, for account of H. P. Farrington......

Bulkhead adjoining Pier foot of Clarkson street, some new planking......

Bulkhead at West Eleventh street, 508 feet on West Eleventh street, and 60 feet on river front, new moving piles and fenders, new backing-pieces and other timber, for account of H. P. Farrington...... Office at Battery, on piles, fitted ready for use........ Grading and filling grounds bounded by Gansevoort and Little West Tweifth sreets, including the whole width of Thirteenth avenue; removing two dumping-boards, erecting storehouse 162 feet by 50 feet, and office 50 by 20 feet, including furniture, and fencing in the entire plot; and also painting buildings and fence.....

$1,632 09

1,863 45

197 59

73 73

1,404 59 2,767 17

19,270 27

Total cost of the above work, for labor and material..... $307,349 37

[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Total number of piers and bulkheads built, rebuilt, and repaired

during the past twelve months....

52

Two offices and one storehouse built, filling in and grading

grounds at Gansevoort street and Thirteenth avenue,
North river, and between Sixteenth and Seventeenth
streets, East river.....

I think it proper to add, that some portion of the work was performed under very adverse circumstances, in severe winter weather, and that obstructions of various kinds had to be removed, which retarded the work, and added materially to the cost of its execution.

Respectfully,

JACOB A. WESTERVELT,
Sup. Rep. and Supplies.