Case Study Data on Productivity and Factory Performance: 5-horsepower, Induction MotorsThis report is divided into three chapters. Chapter 1 is directed primarily to the reader interested in the less detailed aspects of productivity in the industry. Chapter 2 presents detailed case studies of each plant and will be of value to the plant superintendent or the production engineer. Chapter 3 is a brief discussion of workers' earnings, and the benefits to the worker due to increased productivity and unionization, where applicable. The appendixes contain case studies of labor adjustments to technological changes, industry background information, and a copy of the questionnaire used. A glossary of trade and technical terms completes the report. |
Common terms and phrases
1951--Continued Operation Standard 200 indirect labor 5-horsepower A3-1/2-ton punch press Arc-welder assemble stator baffle plate bearing cap Bench Blank bore cate center hole chamfer coils developed from experience diameter Direct man-hours required divided by 200 drill press end covers end of table END PLAY WASHERS end rings fabrication and assembly field ring final assembly fixtures footnotes at end gage for length Hand truck Housing fabrication induction motor Inspect insulation keyway man-hours Adjusted man-hours man-hours per motor man-hours to fabricate manufactured Material specifications milling machine motor Adjusted man-hours motor Machinery motor per motor multispindle drill name plate Niagara oil well caps Operation Standard man-hours pickled and oiled Planned man-hours plant related data required per unit rotor core Rotor fabrication rotor laminations Setup divided Shear sheets sheet steel slots Standard man-hours Adjusted Stator fabrication stator frame stroke terminal box Total direct man-hours turret lathe ventilating fan welded winding workers


